{xpath:/*/%lw-version%/title}

Powered by constructive thinking

Print

News

25.06.2015
WID Borr delivered
Water injection dredger Borr and her kraanponton Farrell are delivered and did their first job in Harwich
Read more
07.05.2015
TMS 100ste crane delivered
The 100th crane of TMS, which can lift up to a depth of 3000 meter and has a reach of 35 meter, is delivered successfully.
Read more
24.02.2015
TMS at Offshore exhibition in copenhagen
TMS will be at the Offshore exhibition in copenhagen from 10 up to 12 March
Read more
09.12.2014
Active heave winch
TMS manufactured Active Heave winch for 3100m wire rope.
Read more
23.10.2014
Pile plugs
TMS builds four pile plugs with intergraded up-ending and lifting facility for the transportation and handling of mono-piles with flange.
Read more
20.10.2014
Side Loader
For placing 120 ton concrete T-beams we developed this side loaders.
Read more
20.10.2014
Piling template
For a new jack-up we have designed and built 2 piling templates.
Read more
20.10.2014
Kobelco piling crane
This Kobelco CKE 2500G lifting crane is modified to a piling crane.
Read more
20.10.2014
Cutting ROV
For remote controlled subsea removal of offshore wind jacket pile stoppers we designed, developed and built this cutting ROV.
Read more
16.10.2014
TMS builds its 100th crane
TMS got the contract for a 25 tons Active Heave Offshore knuckle boom crane which is crane no. 100 for TMS
Read more

[1]  2